Chapman Library Mural

In 1913, the city voted $45,000 in bonds to build Chanute
High School on the east
side of the tracks. Two more bonds in 1927 and 1937 added the trade school and
the junior college. In 1986 a $4,900,000 bond revitalized the high school and
added a new gym at a cost of about $6,400,000.
Copyright 1999-2008 Neosho County Community College